What to Know » How Do Manufactured Homes Ship From the Factory in Arizona?

How Do Manufactured Homes Ship From the Factory in Arizona?

The day a manufactured home leaves the factory is the moment months of planning, engineering, and skilled construction finally turn into a real home on the move. For Arizona buyers, it can feel almost unbelievable: a home is literally shipped down I‑10, I‑17, or a two-lane highway through the desert. But the process is highly organized, tightly regulated, and designed to protect your home from the factory floor all the way to your homesite, whether you’re in Phoenix, Tucson, Yuma, Flagstaff, or a rural community.

It Starts With Final Quality Checks

Before a manufactured home can leave the home building facility (“ship”), it goes through final inspections inside the plant. Crews verify the structure, major systems, and finish work are complete. Depending on the home’s design, inspections may include checks for electrical, plumbing, HVAC, windows and doors, roof sealing, and required safety components. Any loose items to be shipped inside the home are secured, and final touch-ups are completed so the home is ready for travel.

The Home Is Prepped Specifically for Arizona Transport

A manufactured home isn’t shipped the same way it will look when it’s set up. The factory prepares the home with transportation in mind, especially for Arizona’s heat, dust, and monsoon season:

  • Interior protection: Cabinets may be latched, loose fixtures secured, and floors protected.
  • Exterior wrapping: Homes are often wrapped to shield siding, windows, and trim from wind, dust, and road debris. The wrap is removed once your home arrives on-site.
  • Roof and edge protection: Vulnerable edges and rooflines are sealed and reinforced to prevent moisture intrusion and reduce wind damage and vibration during travel.
  • Desert heat considerations: Sealants, tapes, and protective coverings are selected and applied to perform in high temperatures, where surfaces can heat rapidly.
  • Temporary travel features: Some models include transport-only bracing or supports that get removed during installation.

This is one reason manufactured homes look different when they arrive than they do after they’re fully installed.

The Double Wide Home Is Built to Travel in “Sections”

Most manufactured homes ship in one or more sections, depending on the size and layout.

  • Single-section homes (often called single-wides) ship as one unit.
  • Multi-section manufactured homes ship in two or three sections (commonly called double-wides or triple-wides).

Each section is built on a steel chassis/frame and includes its own floor system, walls, roof structure, and many of the internal components. That chassis and frame are what make highway transport possible.

Arizona Permits, Routing, and Escort Vehicles

Unlike a standard trailer, a manufactured home section is usually towed by a specialized transport truck designed for oversized loads. The section is connected to the transporter using a removable towing hitch assembly, and the home rolls on its own transport wheels (which are recycled and do not stay with the home) attached to the chassis.

Because these loads are oversized, transport requires careful planning. In Arizona, carriers commonly coordinate:

  • Route selection (avoiding low bridges, tight turns, weight limits, and construction zones, especially through mountain passes and urban interchanges)
  • Permits (oversize/overweight permits are typically required and may include travel-time restrictions)
  • Escort vehicles (pilot cars may be required depending on the home’s width and the route)
  • Delivery timing (often scheduled for early morning or low-traffic windows to reduce congestion and heat exposure)
  • Weather planning (monsoon storms and high-wind advisories can delay transport)

Shipping a manufactured home is part logistics, part precision driving.

What It Looks Like on the Road in Arizona

If you’ve ever seen a manufactured home moving down the highway, you’ve seen the result of that coordination. The transporter drives slowly and steadily, especially through turns and uneven road surfaces. Escorts may run ahead or behind to manage traffic and watch for clearance issues. In Arizona, drivers also pay close attention to crosswinds, common in open desert areas, and plan carefully around monsoon storm cells and dust storm conditions.

Arrival at the Homesite: Staging Comes First

Once the home arrives, it doesn’t immediately become a “home.” The transporter typically stages the section(s) in the best position for installation based on the lot and the foundation work completed ahead of time.

From there, installers take over. If the home is multi-section:

  • The sections are placed on the foundation or support system
  • They’re aligned and joined (“married”)
  • The roof seam, interior “marriage” wall joints, and exterior seams are sealed
  • Interior connection points are finished
  • Utility hookups are completed
  • Final trim, skirting, and weatherproofing are installed

Arizona note: Tight lots, overhead utility lines, and narrow access roads can affect staging and placement, so site access planning is a big part of delivery success.

How Long Does Shipping Take in Arizona?

Shipping time depends on distance, weather, permits, and route restrictions. Some homes ship locally in a few hours. Others travel across multiple states and take days, especially if escort requirements, permit windows, or mountain routes slow things down. Arizona buyers often see shipping scheduled as part of a coordinated setup timeline so the home arrives when the site is ready, and when monsoon winds or dust storms are not forecast.

What to Expect on Delivery Day (Arizona)

Delivery day is exciting, but it’s also a coordinated workday with trucks, equipment, and professionals on-site. Here’s what Arizona buyers can expect when a manufactured home is delivered and set:

1) The site should be ready before the home arrives.

Your installer or retailer typically confirms foundation readiness (or supports), utility access, and site grading are complete. In Arizona, proper drainage planning matters, especially in monsoon season, so water flows away from the home. If the site isn’t ready, the home may be rescheduled or temporarily staged elsewhere, which can add cost and time.

2) Oversized-load transport arrives first.

For a single-wide, you’ll usually see one transport truck. For a double wide or multi-section home, multiple sections may arrive separately. Escort vehicles may also be present depending on permit requirements and the width of the load.

3) The home is staged and positioned.

The carrier will stage each section in a position that makes setup efficient. On tight lots or infill sites, this step can take time because crews must account for fences, trees, overhead lines, soft desert soil, and turning radiuses.

4) Setup crews place the home on the foundation or supports.

Cranes, hydraulic jacks, or specialized moving equipment may be used, especially for multi-section manufactured homes. Crews level the home and secure it to the approved foundation system per the installation plan. In Arizona, installers also watch for soil conditions that can affect equipment and leveling.

5) Multi-section homes are “married” together.

For double-wides and triple-wides, installers align the sections, connect structural points, complete roof and wall seams, and begin interior finishing at the marriage line.

6) Utility connections and finishing work follow.

Depending on local rules and scope of work, the installer and utility providers may connect electric, water, sewer/septic, and gas. Crews typically complete steps like skirting, steps/landings, exterior trim, and final sealing. In hot climates, sealing and under-home ventilation choices can make a difference for comfort and efficiency.

7) Final inspections may be required.

Many Arizona jurisdictions require inspections for installation, anchoring, and utilities. Once approved, you may receive documentation needed for occupancy and (if applicable) lender requirements.

Tips for Arizona buyers:

• Keep driveway and access routes clear for large trucks and equipment.

• Secure pets and plan for noise and activity.

• If monsoon storms are in the forecast, expect possible rescheduling.

• Expect the home to look “in-progress” until setup and finishing are complete.

• Ask your installer for a delivery-day checklist so you know who is responsible for each step.

The key takeaway: delivery day is the start of setup, not the final step. With good site prep and an experienced installation team, manufactured home delivery and installation in Arizona can be smooth and predictable.

The Big Takeaway

Manufactured homes ship from the factory as carefully protected, transport-ready sections on a steel chassis. A specialized carrier tows each section using an approved route with permits and (when required) escort vehicles. Once delivered, professional installers set the home on its foundation, connect the sections, and complete finishing work.

It’s a process built for safety and reliability, and when done correctly, it’s one of the reasons manufactured housing can deliver high-quality homes efficiently across Arizona and the rest of the country.